PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed Areaway Drains Facing East (800x600).jpg Poured concrete at the subgrade column E.3-6.5 Facing North (800x600).jpg Continued fixing the main steel column at the Monumental Stairs Facing South (800x600).jpg Continued installing Stairs -2 (2nd Floor) Facing West (800x600).jpg Installed metal decking at the Roof Facing South (800x600).jpg Started installing conduit at Stairs -5 Facing West (800x600).jpg
Previous pageNext page Installed metal decking at the Roof Facing South (800x600)
Installed metal decking at the Roof Facing South (800x600)